Cecilware JAVA2-LP User Manual Page 2

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 1
2
INSTALLATION
Water Inlet Connection:
This equipment is to be installed to comply with the applicable Federal, State, or local plumbing codes having jurisdiction. In
addition:
1. A quick disconnect water connection or enough ext
ra coiled tubing (at least 2x the depth of the unit) so that the machine
can be moved for cleaning underneath.
2. An approved back flow prevention device, such as a double check
valve to be installed between the machine and the water
supply.
The JAVA2-LP is equipped with a 1/4"
Flare Water Inlet Fitting, located on the lower left side in the back of the base.
HIGHLY RECOMMENDED:
A WATER SHUT-OFF VALVE and A WATER FILTER, pref
erably a combination Charcoal/Phosphate Filter, to remove odors and
inhibit lime and scale build up in the machine. Note: In areas with extremely hard water, a water softener must be installed
in order to prevent a malfunctioning of the equipment and in order not to void the warranty.
STARTUP PROCEDURE
Caution: Make sure that the Heater Switch, located behind right hopper with door opened,
is in the OFF position.
1. Connect the 1/4" dia copper waterline to the 1/4" flare water inlet fitting of the valve.
2. Plug the power cord i
nto a proper receptacle.
3. Activate the Power Switch (Toggle Up). T
he door display panel and the green dispense buttons will light up and the tank
will start filling. Allow approximately 2 minutes for the tank to fill.
4. Activate the Heater Switch. Allow approximately 15 - 20 minutes for
the water to reach a preset temperature of
200°F. The heat up time will depend on the water inlet temperature, the input voltage and the wattage of the elements
in the machine.
5. Place cup under nozzle and press dispense switch. The machine will dispense wat
er at the rate of 1-1.3 oz. per second.
Repeat it several times for each dispen
se switch to check for consistent output.
6. While the tank is heating up, remove the hoppers, load them with products and reposition them back in the machine.
When the heater light goes OFF, t
he tank has reached its brew temperature and the machine is ready to dispense Coffee.
VOLUME AND DRINK SIZE ADJUSTMENTS:
Page view 1
1 2 3 4 5 6 7 ... 11 12

Comments to this Manuals

No comments